91 Saheel

  • The project timeline is 6 months, inclusive of approvals.

  • Full interior and landscaping refurb with Ground Floor (GF) and First Floor (FF) extensions, resulting in the addition of a bedroom, taking it from a 3 + 1 ensuite, to a 4 bed + 4 ensuite.

  • Property was valued by the bank at AED 7.9m, demonstrating that we made AED 400k on the buy.

  • Estimated return on investment (ROI) for this project is 29% conservatively as we leveraged the bank.

Previous
Previous

286 Saheel

Next
Next

Mira Oasis #2, REEM